BRIDGE STATISTICS AS ON YEAR 31.3.2001

Sl Name of Bridge Location Span Type Year of Year of Cost Remarks
No   (chainage) (in metre)   Constn. Completion    
1 2 3 4 5 6 7 8 9
  Tlabung Division              
1 R.Sailungrek 0.60 Km on P-B rd. 65.60 D/D Bailey 1993 1995 82.64  
2 R.De 18.50 Km on P-B rd. 60.80 D/D/R Bailey 1996 1998 174.00  
3 R.Tuipawl 30.00 Km on P-B rd. 24.00 D.S Bailey 1995 1995 48.76  
4 R.Zawlpui 33.00 Km on P-B rd. 33.30 D.S Bailey 1998 1998 61.78  
5 R.Tuichawng On Chawngte town 98.00 Jeepable suspension bridge 1991 1992 9.98  
6 R.Chawngte On Chawngte town 98.00 -do- 1991 1992 9.98  
  Saiha              
1 Saiha-Chhuarlung-Tuipang Rd.              
I) Semi-Permanent Timber over R.Tuisih 24.00 Kmp 50.00 SPT 1996 1996 700000.00  
2 Kawlchaw-Tongkolong Rd.              
I) Kawlchaw 0.50 Kmp 13.40 SPT 1996 1996 790000.00  
ii) Kawlawh 08.50 Kmp 28.80 SPT 1993 1993 770000.00  
iii) Tuikhurlui 13.00 Kmp 5.00 SPT 1993 1993 100000.00  
iv) Chamo lui 15.00 Kmp 6.00 SPT 1993 1993 100000.00  
v) Maisa 39.00 Kmp 15.20 SPT 1993 1993 460000.00  
vi) Leiletlui 44.00 Kmp 4.90 SPT 1999 1999 100000.00  
vii) Tapaku 54.00 Kmp 6.00 SPT 1999 1999 300000.00  
3 Diltlang-Chawngte Rd. 2.80 Kmp 85.50 SPT 1999 1999 500000.00  
  Lunglei              
1 RCC Bridge over R.Dhubi at College veng, Lunglei 0.900Km 6.00 RCC single lane 1998 1998 356068.00  
2 RCC Bridge over Tuikhurlui on Ring Road at Venghlun-College veng Junction at Lunglei 1.200Km 10.00 RCC single lane 1998 1998 400000.00  
3 Bailey Bridge over R.Tlawng on Lunglei-Thenzawl rd. 20.00Km 140.00 Bailey Bridge 1995 1996 5500000.00 Original structure washed away by flood in 1996 and reconstructed during the same year.
4 Bailey Bridge at Kawlhawk kham on Lunglei-Buarpui rd. 55.200Km 80.00 Ft. Bailey Bridge 1997 1997 4000000.00  
  Serchhip Division              
1 Keitum-N.Vanlaiphai Road over Tuichang Bridge 6.20 Km 60.00 Bailey bridge 1981 1982 24.16 lakhs  
2 Bridge over River Varhva - 21.75 RCC T.Beam bridge 1995 1996 17.88 lakhs  
  NEC Division, Champhai              
1 S/S Bailey Bridge over R.Tuipawl on CNV rd. 4.559 Kmp 40.00 S/S Bailey Bridge 1996 1996 - Cost No record by BRTF when taken over from them
2 Jeepable suspension Bridge over R.Thlikva on Lock Trace rd. 12.00 Kmp 66.00 Suspension bridge 1994 1994 3.32 lakhs  
3 RCC Bridge over R.Tuipui on Champhai-Tlangsam rd. 1.300 Kmp 48.00 RCC bridge 1991 1991 5.20 lakhs  
  Khawzawl Division               
1 Tuichang 20.00 Kmp on KST rd. 100 ft. Bailey Bridge 1994 1995   Completed
2 R.Phalte 58.00 Kmp on KST rd. 140 ft. Bailey Bridge 1999 - 90.413 lakhs (A/A amt.) Work in Progress
3 R.Tuiphal 48.00 Kmp on Kawlkulh-Ngopa-Mimbung rd. 100 ft. Bailey Bridge - - -  
4 R.Tuivai 117.300 Kmp on KST rd. 270 ft. Steel Girder Bridge 1999 - 206.08 lakhs (T/S amt.) Work in Progress
  Saitual Division              
1 RCC T.Beam at R.Chhirdem 31.998 20.00m RCC T.Beams 1991 1991 17.311 lakhs  
2 Bailey Bridge at R.Tuivawl 25.994 57.58m 24 R 1991 1993 187.00 lakhs  
  Road North              
1 Chite Bridge (Bailey) 1.55 Kmp 18Rm Bailey Bridge 1996 1996 17.52 lakhs  
  Hmuifang Division              
1 Tlawng Bridge on Sateek- Sabual road 13.50 Kmp 75 Rm Timber Suspension Bridge 1997 1997 2.356 lakhs  
2 Changte Bridge 49.45 Kmp 25Rm Bailey Bridge 1983 1984 12.00 lakhs  
3 RCC Bridge on A-L Road 57.90 Kmp 9 M RCC Bridge 1995 1996 2.00 lakhs  
4 Semi-permanent Timber bridge on A-L rd. 63.60 Kmp 10m Timber Bridge 1988 1988 0.50 lakhs  
5 Semi-permanent Timber bridge on A-L rd. 63.90 Kmp 6m Timber Bridge 1988 1988 0.60 lakhs  
6 Semi-permanent Timber bridge on A-L rd. 64.0 0 Km 8m Timber Bridge 1988 1988 0.40 lakhs  
7 Semi-permanent Timber bridge on A-L rd. 64.20 Kmp 8m Timber Bridge 1988 1988 0.40 lakhs  
8 Semi-permanent Timber bridge on A-L rd. 64.50 Kmp 8m Timber Bridge 1988 1988 0.40 lakhs  
9 Semi-permanent Timber bridge on A-L rd. 64.70 Kmp 17m Timber Bridge 1988 1988 0.80 lakhs  
10 Lamchhip-Chawilung road 5.00 Kmp 6m Timber Bridge 1988 1988 0.30 lakhs  
11 Bailey Bridge R.Tlawng on Thenzawl-Bunghmun rd. 22.00 Kmp 200 or 60.96 m Bailey Bridge 1999 1999 unknown As it was taken over from BRTF, the cost of bridge could not be traced out from this sub-divn. This also, was constructed by Lunglei Division, the cost could not be found out in this sub-divn.
12 Bailey Bridge over R.Vanva near Buangpui on Lunglei to Thenzawl rd. 75.00 Kmp 24.40m Bailey Bridge 1986 1986 unknown
13 Suspension Bridge over R.Vanva Chhipphir to Haulawng rd. 9.00 Kmp 50.00m Suspension bridge 1995 1995 3.84 lakhs
  Aizawl South Division              
1 Suspension Bridge over River Tlawng on Aizawl-Reiek-W.Lungdar rd. 15 45 Suspension Bridge 1996 1996 47.76 lakhs  
2 RCC Jeepable Bridge on Sihtuikhur-Nurawnglui 0.34 40 RCC 1997 1997 15.00 lakhs  
3 RCC Brindge on Bethlehem vengthlang-Armed veng 'S' 0.15 6 RCC 2000 2000 10.00 lakhs  
  National Highway Division-11               
1 (Tuirini Bridge) Bailey Bridge 24.400Km 200.00ft B.B        
2 Bridge over Luaklui Bailey 136.00Km 90.00ft B.B        
3 Bridge over Luakzal Bailey 137.00Km 60.00ft B.B        
  Kolasib Division              
1 Bailey bridge over River Serlui on Bilkhawthlir to Saiphai rd. 15.20Km 140ft Bailey bridge 97-'98 1990 1575600.00  
2 Suspension bridge over R.Chemlui (Kolasib to Builum rd.) 7.80Km 40.00Rm Suspension type 1999 1999 454000.00  
3 Bailey bridge over R.Kawnpui (K-B) rd. 32.80Km 39.00Rm Bailey bridge 90-'92 1992 37.869 lakhs  
4 Bailey Bridge over R.Bairabi (KBGH ) rd. 61.00Km 32.00Rm Bailey bridge 90-'93 1993 31.213 lakhs  
5 SPT Bridge over R.Cheppui (Bilkhawthlir-Saiphai rd) 8.80Km 30.00Rm SPT 97-'98 1997 228200.00  
6 Chhimluanglui bridge on Bilkhawthlir-Buhchang rd. 12.00Km 26.00Rm RCC double lane T.Beam bridge 95-'96 1996 243000.00  
7 Bailey bridge over R.Pumphir (KBGH rd.) 56.00Km 24.00Rm Bailey bridge 90-'92 1992 20.678lakhs  
8 SPT Bridge over (Kolasib-Buhchang rd.) 7.758Km 22.00Rm SPT 1994 1994 53800.00  
9 SPT Bridge over R.Chepte (Bilkhawthlir to Saiphai rd.) 11.20Km 22.00Rm SPT 97-'98 1997 95650.00  
10 Bailey Bridge over R.Chhimluang (K-B) rd. 26.50Km 20.00Rm Bailey bridge 90-92 1992 18.968lakhs  
11 Hmarluanglui bridge (Bilkhawthlir-Buhchang rd.) 8.10Km 19.00Rm RCC double lane T.Beam bridge 96-'97 1996 203000.00  
12 SPT Bridge over R.Sesih (Bilkhawthlir-Saiphai ) rd. 16.90Km 18.80Rm SPT 97-'98 1997 30400.00  
13 RCC Bridge (Buhchang-Phaise) rd. 30.00Km 18.60Rm RCC 1994 1994 1708000.00  
14 Bailey Bridge (Kolasib-Buchang) rd. Saihapui sand quarry 15.50Rm Bailey bridge 1998 1999 185500.00  
15 SPT Bridge over Tuichhuahen lui on appr.rd. to Zophai Police Out Post from KBGH rd. 2.89Km 15.00Rm SPT 2000 2000 155609.00  
16 SPT Bridge over Chawngkawllui on appr.rd. to Zophai Police Outpost from KBGH rd. 1.33Km 15.00Rm SPT 1994 1994 544300.00  
17 RCC Bridge Tuichhuahen lui K-B Road 10.50Km 15.00Rm RCC 1989 1990 1631000.00  
18 Lungpher Bridge (Kawnpui-Hortoki rd.) 16.38Km 12.00Rm RCC 1990 1992 2394000.00  
19 Semi-Permanent bridge over R.Sihlui (Kolasib to Builum rd.) 16.44Km 12.00Rm SPT 2000 2000 56000.00  
20 RCC Bridge (Kolasib-Buhchang rd.) 1.83Km 8.80Rm RCC 1994 1995 580400.00  
21 RCC Bridge (Kolasib-Buhchang rd.) 949 8.70Rm RCC 1994 1994 544300.00  
22 RCC Bridge (Kolasib-Buhchang rd.) sand quarry 8.50Rm RCC 1994 1995 533500.00  
23 RCC Bridge over R.Sailungvar (K-B)rd. 31.15 Km 8.00Rm RCC Slab 1992 1992 13.762lakhs  
24 RCC Slab bridge over R.Kawnpui East 28.00Km 8.00Rm RCC Slab 1995 1995 13.762lakhs  
25 Chilui lei (K-B rd.) 6.60Km 7.00Rm RCC 1993 1993 643000.00  
  NH Division - 1              
1 Bailey Bridge over R.Dialdawk 19.80/0Km 110.00 B.B 1974      
2 Bridge over R.Tut 50.70/0Km 370.00 B.B 1979      
3 Bridge over R.Daplui 52.20Km 32.00 B.B 1989      
4 Bridge over R.Teirei 55.00Km 55.00 B.B 1992      

 

Developed, Designed and Hosted by
National Informatics Centre, Mizoram State Unit
with the contents provided by Public Works Department, Government of M