|
ROAD LENGTH UNDER PWD AS
ON 31.3.2001
PROJECT DIVISION-III
|
SI.No |
Name of Road |
Classifi-cation of Road |
Total length of Road (in Km) |
Road width (in Metre) |
Status of Road (in Km) |
Pavement width (in Metre) |
Culvert (in Nos.) |
Protection Wall (in No.) |
Side Drain (in Nos) |
Link drain (in Nos.) |
Cause way No. (in Nos.) |
|
Earth |
WBM |
Black Top |
HP |
RCC |
No. of Culvert |
Stone Masonry |
RCC |
S/D No. |
Stone Masonry |
RCC |
Total |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
18 |
19 |
20 |
|
1 |
Appr. Road to NEHU Complex |
TR |
6.80 |
5.95 |
1.65 |
|
5.15 |
3.75 |
|
10 |
10 |
|
|
|
|
|
|
|
|
|
|
TOTAL |
|
6.80 |
|
1.65 |
|
5.15 |
|
|
10 |
10 |
|
- |
- |
- |
- |
- |
- |
- |
|
|