Home
Government to Citizen
Government to Business
Government to Government
Contact
 Feedback
 List of Officers
 

ROAD LENGTH UNDER PWD AS ON 31.3.2001
TLABUNG DIVISION

SI
No
Name of Road Classifi-cation of Road Total length of Road (in Km) Road width     (in Metre) Status of Road (in Km) Pavement width (in Metre) Culvert (in Nos.) Protection Wall     (in No.) Side Drain (in Nos) Link drain (in Nos.) Cause way No. (in Nos.)
Earth WBM Black Top HP RCC No. of Culvert Stone Masonry RCC S/D No. Stone Masonry RCC Total
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
1 P.B.Road MDR 69.00 5.95 _ 16.00 53.00 _ 125 _ 125 125 _ _ 1 _ _ _ _
2 L-C Road MDR 53.25 5.95 _ _ 53.25 _ 143 16 159 159 _ _ _ _ _ _ _
  Total of MDR   122.25     16.00 106.25   268 16 284 284 0 0 1 0 0 0 0
3 Tlabung-Borapansury Road ODR 38.00 5.95 33.00 4.00 1.00 _ 165 6 171 _ _ _ _ _ _ _ _
  Total of ODR   38.00   33.00 4.00 1.00   165 6 171 0 0 0 0 0 0 0 0
  Chawngte town road                                    
4 Chawngte -Borapansury road V.R 35.00 4.00 35.00 _ _ _ _ 5 5 1 _ _ _ _ _ _ _
  Total of VR   35.00   35.00 0.00 0.00   0 5 5 1 0 0 0 0 0 0 0
  STR                                    
5 IB Approach Road STR 0.40 4.00 _ _ 0.40 _ 1 _ 1 _ _ _ _ _ _ _ _
6 Bridge approach Road STR 0.60 4.00 _ _ 0.60 3.20 1 _ 1 _ _ _ _ _ _ _ _
7 Main Road STR 0.70 4.00 _ _ 0.70 3.20 _ _ _ _ _ _ _ _ _ _ _
8 Bazar -SD_STD ( C Office ) STR 0.80 4.00 _ _ 0.80 3.00 1 _ 1 _ _ _ _ _ _ _ _
9 Bazar -PHC STR 0.80 4.00 _ _ 0.80 3.00 _ _ _ _ _ _ _ _ _ _ _
10 Chawngte (P town road ) STR 0.50 4.00 _ _ 0.50 3.00 _ _ _ _ _ _ _ _ _ _ _
11 Helipad approach road STR 1.40 4.00 1.40 _ _ 3.00 _ _ _   _ _ _ _ _ _ _
12 BRTF rd.-SDO Office STR 3.40 4.00 _ _ 3.40 3.20 _ _ _ 2 _ _ _ _ _ _ _
13 BRTF rd. PWD IB STR 1.00 4.00 _ _ 1.00 3.20 _ _ _   _ _ _ _ _ _ _
14 Parallel road STR 1.00 4.00 _ _ 1.00 3.00 _ 2 2 1 _ _ _ _ _ _ _
15 BRTF rd.-Indoor STR 1.40 4.00 _ _ 1.40 3.00 _ _ _ _ _ _ _ _ _ _ _
16 BRTF rd.-Indoor via Power House STR 2.50 4.00 _ _ 2.50 3.00 _ 1 1 _ _ _ _ _ _ _ _
17 Approach rd.-DC Rest House STR 0.70 4.00 _ _ 0.70 3.00 _ _ _ _ _ _ _ _ _ _ _
18 Hmar veng approach road STR 1.30 4.00 _ _ 1.30 3.00 _ 1 1 _ _ _ _ _ _ _ _
19 PHC approach road STR 0.70 4.00 _ _ 0.70 3.00 _ _ _ _ _ _ _ _ _ _ _
20 Central road STR 0.80 4.00 _ _ 0.80 3.20 _ 1 1 _ _ _ _ _ _ _ _
21 Helipad approach road STR 1.60 4.00 _ _ 1.60 3.20 _ _ _ 2 _ _ _ _ _ _ _
22 Main Road STR 1.80 4.00 _ _ 1.80 3.20 _ 1 1 _ _ _ _ _ _ _ _
23 IB to PO STR 1.30 4.00 _ _ 1.30 3.20 1 _ 1 _ _ _ _ _ _ _ _
24 Zodin - BRTF rd. STR 1.40 4.00 _ _ 1.40 3.20 1 _ 1 _ _ _ _ _ _ _ _
25 Zodinkawn to EE Residence STR 1.10 4.00 _ _ 1.10 3.20 _ _ _ _ _ _ _ _ _ _ _
26 EE Office - BRTF rd STR 0.80 4.00 _ _ 0.80 3.20 _ _ _ _ _ _ _ _ _ _ _
27 Approach road - PWD Complex STR 1.20 4.00 _ _ 1.20 3.00 _ _ _ _ _ _ _ _ _ _ _
28 Approach road - SDO Residence STR 0.60 4.00 _ _ 0.60 3.00 _ _ _ _ _ _ _ _ _ _ _
29 Approach road - SDO ( C Office ) STR 0.80 4.00 _ _ 0.80 3.00 _ _ _ _ _ _ _ _ _ _ _
30 Approach road - Playground STR 0.60 4.00 _ _ 0.60 3.00 _ _ _ _ _ _ _ _ _ _ _
  Total of STR   29.20   1.40 0.00 27.80   5 6 11 5 0 0 0 0 0 0 0
  G.Total   224.45   69.40 20.00 135.05   438 33 471 290 0 0 1 0 0 0 0
 

Developed, Designed and Hosted by
National Informatics Centre, Mizoram State Unit
with the contents provided by Public Works Department, Government of Mizoram