5 - SEMI PERMANENT
AND TEMPORARY BRIDGE |
|
Sl No |
Description |
Unit |
Rate |
|
|
|
|
|
|
|
121 |
Construction of temporary bridge 3.00m clear roadway with round
jungle wood piles/fender piles (where nescessary) of 20cm average
dia. 5 nos per row driven 180cm to 240cm below ground with 2m pile
row to pile row and 20cm average dia. round jungle wood bearing
beams, long beams and wheel guards; 15cm average dia. round jungle
wood decking closely packed and railing post at every 1m apart, and
horizontal and diagonal bracing 10cm average dia. round jungle wood,
railing and struts of 10cm average dia. round jungle wood, and wheel
track of 5cm average dia. round jungle wood 0.6m wide for both
tracks complete with coal tarring including all iron fittings, nails
etc. complete. |
Rm |
Rs.4,196.90 |
|
|
|
(Rupees four thousand one hundred ninety six and paise ninety) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
122 |
Supplying at the site timber (Jarul, Nihar,
Sal or Thingri and Thingsia ) piles
of required length and sections. |
cum |
Rs.5,500.00 |
|
|
|
(Rupees five thousand five hundred) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
123 |
Labour for driving timber piles including two coats of coal tarring
complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(a) |
Portion below ground actually driven. |
|
|
|
|
|
|
|
|
|
|
|
(i) 20 cm average dia. |
Rm |
Rs.516.20 |
|
|
|
|
|
(Rupees five hundred sixteen and paise twenty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(ii) 25cm average dia. |
Rm |
Rs.524.50 |
|
|
|
|
|
(Rupees five hundred twenty four and paise fifty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
(b) |
Portion above ground. |
|
|
|
|
|
|
|
|
|
|
|
(i) 20 cm average dia. |
Rm |
Rs.141.50 |
|
|
|
|
|
(Rupees one hundred forty one and paise fifty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(ii) 25cm average dia. |
Rm |
Rs.145.70 |
|
|
|
|
|
(Rupees one hundred forty five and paise seventy) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
124 |
Providing undressed wood work in site
timber 1st class local wood including
fitting and fixing with necessary bolts, nuts, spikes, straps,
nails, etc. and coal tarring two coats complete.
(bearing beam, long beam, decking, wheel
guard, bracing, railing, struts, etc.) |
cum |
Rs.5,665.00 |
|
|
|
(Rupees five thousand six hundred sixty five) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
125 |
Supplying, fitting and fixing R.S. beams, M.S. angles, M.S. tees,
M.S. channels, bed plates, iron bolts in semi permanent bridges. |
qtl |
Rs.4,403.90 |
|
|
|
(Rupees four thousand four hundred three and paise ninety) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
126 |
Labour for refitting old RSJ beams including cutting to size,
drilling holes and providing two coats of anti-corrosive paints. |
qtl |
Rs.1,465.20 |
|
|
|
(Rupees one thousand four hundred sixty five and paise twenty) only. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|