SCHEDULE  OF  RATES  2003
FOR  SOUTHERN  MIZORAM

Basic Rates
Hire Charge of Plants & Machineries
PART A - CARRIAGE  OF  MATERIALS
1 By Mechanical Transport
2 By Manual Labour
PART B - ROAD  WORKS
1 Site Clearance
2 Earthwork
3 Subgrade
4

Sub Base

5 Base
6 Bituminous Work
7 Culverts
8 Back Filling
9 Drain
10 Traffic and Transportation
11 Dismantling and Repair
PART C - BRIDGE  WORKS
1 Earthwork
2 Foundation
3 Substructure
4 Superstructure
5 Semi Permanent and Temporary Bridge
PART D - BUILDING  WORKS
1 Earthwork
2 Cement Mortar
3 Plain Cement Concrete
4 Reinforced Cement Concrete
5 Design Mix Concrete
6 Precast Concrete
7 Brick Work
8 Stone Work
9 Wood Work
10 Door and Window Fitting
11 Steel Work
12 Alluminium and Glass
13 Flooring
14 Walling
15 Roofing
16 Ceiling
17 Plastering
18 Pointing
19 Painting
20 Sanitary Installation
21 Water Supply
22 Fencing
23 Temporary Building
24 Dismantling and Repair
PART E - GENERAL  INFORMATIONS
1 Unit of Requirements for commonly used Items of Works
Unit 1
Unit 2
Unit 3
Unit 4
2 Steel coefficient for RCC Works
PART F - PLINTH  AREA  RATES
 