1 - BY  MECHANICAL  TRANSPORT
( Including loading, unloading and stacking etc. )

 

    Gross Net   CARRIAGE  RATE  PER  UNIT  QUANTITY  FOR  A  LEAD  OF    
Sl   Capacity Quantity Unit           Beyond    
No Materials per after of           5 km    
    Trip deduction Rates 1 km 2 km 3 km 4 km 5 km per unit    
      of voids             per km    
1 2 3 4 3 4 5 6 7 8 9    
                       
1 a) Lime, moorum,                   SOR 2000
building rubbish. 6.00 6.00 cum 142.52 156.49 170.12 182.99 195.16 8.43 121.80 8.33
  b) Earth. 6.00 4.80 cum 178.15 195.61 212.65 228.73 243.95 10.53 152.25 10.41
  c) Manure or                      
sludge. 6.00 5.52 cum 154.91 170.10 184.91 198.90 212.13 9.16 132.39 9.05
  d) Excavated rock. 6.00 3.00 cum 285.04 312.98 340.24 365.97 390.32 16.86 243.60 16.65
  e) Sand, aggregate                      
below 40mm 5.00 5.00 cum 171.02 187.79 204.14 219.58 234.19 10.11 146.16 9.99
nominal size.                      
  f ) Aggregate                      
40mm nominal 5.00 4.62 cum 185.09 203.24 220.93 237.65 253.46 10.95 158.18 10.81
size and above.                      
  g) Stone boulder. 5.00 4.25 cum 201.20 220.93 240.17 258.33 275.52 11.90 171.95 11.75
  h) Concrete block. 3.00 3.00 cum 285.04 312.98 340.24 365.97 390.32 16.86    
  i ) Brick. 2000 2000 1000nos 427.56 469.47 510.35 548.96 585.48 25.28 365.40 24.98
  j ) Brick tile,                      
roofing tile. 3200 3200 1000nos 267.22 293.42 318.97 343.10 365.93 15.80 228.37 15.61
  k) Steam coal. 5.50 5.50 ton 155.48 170.72 185.58 199.62 212.90 9.19 132.87 9.08
  l ) Empty cement                      
bag. 2000 2000 1000nos 427.56 469.47 510.35 548.96 585.48 25.28 365.40 24.98
                         
2 a) Steel. 7.00 7.00 ton 122.16 134.14 145.82 156.85 167.28 7.22 104.40 7.14
  b) Timber. 5.00 5.00 cum 171.02 187.79 204.14 219.58 234.19 10.11 146.16 9.99
  c) Tar, bitumen,                      
roofing felt,                      
flooring felt, 4.50 4.50 ton 190.03 208.65 226.82 243.98 260.21 11.24 162.40 11.10
asphalt, etc.                   10627.18 Silchar
  d) Cement, stone                     Kawrthah
block, GI, CC, CI                      
& AC pipes below                      
100mm dia and 7.00 7.00 ton 122.16 134.14 145.82 156.85 167.28 7.22 104.40 7.14
other heavy mate-                      
rials.                      
  e ) Glass block                      
(hollow) 200x 1000 1000 100nos 85.51 93.89 102.07 109.79 117.10 5.06 73.08 5.00
200x100mm.                      
                       
                       
3 a) RCC pipe, steel                      
cylinder, CI pipe,                      
RC pipe, unrein-                      
forced cement pipe,                      
prestressed con-                      
crete pipes.                      
  i) 100mm dia. 80x3.66m 292.80 m 2.92 3.21 3.49 3.75 4.00 0.17 2.50 0.17
  ii) 125mm dia. 60x3.66m 219.60 m 3.89 4.28 4.65 5.00 5.33 0.23 3.33 0.23
  iii) 150mm dia. 50x3.66m 183.00 m 4.67 5.13 5.58 6.00 6.40 0.28 3.99 0.27
  iv) 200mm dia. 30x3.66m 109.80 m 7.79 8.55 9.30 10.00 10.66 0.46 6.66 0.46
  v) 250mm dia. 22x3.66m 80.52 m 10.62 11.66 12.68 13.64 14.54 0.63 9.08 0.62
  vi) 300mm dia. 17x3.66m 62.22 m 13.74 15.09 16.40 17.65 18.82 0.81 11.75 0.80
  vii) 350mm dia. 12x3.66m 43.92 m 19.47 21.38 23.24 25.00 26.66 1.15 16.64 1.14
  viii) 400mm dia. 9x3.66m 32.94 m 25.96 28.50 30.99 33.33 35.55 1.54 22.19 1.52
  ix) 450mm and                   0.00 0.00
500mm dia. 7x3.66m 25.62 m 33.38 36.65 39.84 42.85 45.71 1.97 28.52 1.95
  x) 600, 700, 750,                   0.00 0.00
and 800mm dia. 5x3.66m 18.30 m 46.73 51.31 55.78 60.00 63.99 2.76 39.93 2.73
  xi) 900mm dia. 3x3.66m 10.98 m 77.88 85.51 92.96 99.99 106.65 4.61    
  xii) 1000, 1100,                      
  and 1200mm dia. 2x3.66m 7.32 m 116.82 128.27 139.44 149.99 159.97 6.91    
  b) RCC Hume pipes                      
  i ) NP3 900mm dia. 4x2.5m 10.00 m 85.51 93.89 102.07 109.79 117.10 5.06    
  ii) NP3 1200mm dia. 3x2.5m 10.00 m 85.51 93.89 102.07 109.79 117.10 5.06    
                         
  c) SW pipes.                      
  i) 100mm dia. 800x0.6m 480.00 m 1.78 1.96 2.13 2.29 2.44 0.11 1.52 0.10
  ii) 150mm dia. 400x0.6m 240.00 m 3.56 3.91 4.25 4.57 4.88 0.21 3.05 0.21
  iii) 200mm dia. 225x0.6m 135.00 m 6.33 6.96 7.56 8.13 8.67 0.37 5.41 0.37
  iv) 230mm dia. 175x0.6m 105.00 m 8.14 8.94 9.72 10.46 11.15 0.48 6.96 0.48
  v) 250mm dia. 140x0.6m 84.00 m 10.18 11.18 12.15 13.07 13.94 0.60 8.70 0.59
  vi) 300mm dia. 110x0.6m 66.00 m 12.96 14.23 15.47 16.64 17.74 0.77 11.07 0.76
  vii) 350mm dia. 80x0.6m 48.00 m 17.81 19.56 21.26 22.87 24.40 1.05 15.22 1.04
  viii) 400mm dia. 55x0.6m 33.00 m 25.91 28.45 30.93 33.27 35.48 1.53 22.15 1.51
  ix) 450mm dia 45x0.6m 27.00 m 31.67 34.78 37.80 40.66 43.37 1.87 27.07 1.85
  x) 500mm dia. 40x0.6m 24.00 m 35.63 39.12 42.53 45.75 48.79 2.11 30.45 2.08
  x) 600mm dia. 30x0.6m 18.00 m 47.51 52.16 56.71 61.00 65.05 2.81 40.60 2.78
NOTES :                      
1 The carriage rates are of loose quantity of materials, i.e. before deduction of voids if any.    
2 Analysis based on CPWD Analysis of Rates 1997, Vol - I          