2 - EARTHWORK

 

Sl No Description Unit Rate
       
14 Earthwork in excavation exclusive of compensation of earth in -    
   
       
(a) Ordinary soil.    
       
  (i) Kassi work undressed involving an average horizontal throw upto 2 metres and an average vertical lift upto 0.50 metres including breaking of clods. cum Rs.32.30
    (Rupees thirty two and paise thirty) only.
   
     
     
       
       
  (ii) Earthwork with combined lead upto 15 metres including breaking of clods. cum Rs.43.10
    (Rupees forty three and paise ten) only.
   
       
       
(b) Hard soil ( pick work ). cum Rs.65.10
      (Rupees sixty five and paise ten) only.
     
       
(c) Soft Rock ( blasting work ). cum Rs.208.00
      (Rupees two hundred eight) only.
     
       
(d) Hard Rock ( blasting work ). cum Rs.301.00
      (Rupees three hundred one) only.
     
       
(e) Chiselling/  wedging out rock where blasting is prohibited.    
     
       
  (i)  Soft Rock. cum Rs.388.60
      (Rupees three hundred eighty eight and paise sixty) only.
     
       
  (ii)  Hard Rock. cum Rs.596.50
      (Rupees five hundred ninety six and paise fifty) only.
     
       
( f ) Marshy soil including pumping out water, removal of the same and disposal within a lead of 15 metres.    
  cum Rs.64.60
    (Rupees sixty four and paise sixty) only.
     
       
15 Extra for additional lead as in through cutting or when excavated earth/ rock etc. can not be disposed of directly to valley below, by manual means (when lead is more than 15m).    
   
   
   
   
       
(a) Ordinary and Hard Soil.    
       
  (i)  When over all lead is upto 50m. cum Rs.30.10
      (Rupees thirty and paise ten) only.
     
       
  (ii)  When over all lead is upto 100m. cum Rs.66.80
      (Rupees sixty six and paise eighty) only.
     
       
(b) Soft and Hard rock.    
       
  (i)  When over all lead is upto 50m. cum Rs.48.20
      (Rupees forty eight and paise twenty) only.
     
       
  (ii)  When over all lead is upto 100m. cum Rs.106.90
      (Rupees one hundred six and paise ninety) only.
     
       
16 Earthwork in surface excavation and dressing including cutting and filling upto 15 cm depth, disposal of excavated earth upto 50m and lift upto 1.5m. sqm Rs.14.70
  (Rupees fourteen and paise seventy) only.
 
   
       
       
17 Earthwork in excavation in foundation trenches, drains, etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and disposal of all surplus soil as directed within a lead of 30 metres.    
   
   
   
   
   
       
(a) Oridinary Soil cum Rs.68.00
      (Rupees sixty eight) only.
     
       
(b) Hard Soil  ( pick work ) cum Rs.102.00
      (Rupees one hundred two) only.
     
       
(c) Very Hard Soil  ( jumper work ). cum Rs.158.60
      (Rupees one hundred fifty eight and paise sixty) only.
     
       
(d) Soft Rock ( blasting work ). cum Rs.223.20
      (Rupees two hundred twenty three and paise twenty) only.
     
       
       
(e) Hard Rock ( blasting work ). cum Rs.310.60
      (Rupees three hundred ten and paise sixty) only.
     
       
( f ) Chiselling/  wedging out rock where blasting is prohibited.    
     
       
  (i) Soft Rock. cum Rs.477.00
      (Rupees four hundred seventy seven) only.
     
       
  (ii) Hard Rock cum Rs.755.70
      (Rupees seven hundred fifty five and paise seventy) only.
     