3 - SUBGRADE  AND  COMPACTION

 

Sl No Description Unit Rate
       
18 Dressing of earthwork including cutting and filling upto 15cm. cum Rs.17.10
  (Rupees seventeen and paise ten) only.
     
       
19 Cutting/trenching the subgrade to proper slope, camber and removing inequalties including removing the stuff and depositing on the road side slope (cutting of earth shall be paid separately). sqm Rs.0.40
  (Paise forty) only.
 
   
   
       
       
20 Heavy dressing of subgrade including minor correction of camber and superelevation (earth cutting exceeding 10cm depth shall be paid separately). sqm Rs.1.20
  (Rupees one and paise twenty) only.
 
   
       
       
21 Laying earth as per specification for compaction in 250mm thick loose layers and dressing but excluding rolling and watering.    
   
   
   
       
(a) By manual means.    
  i) When laying of earth in layers is done simultaneously with excavation of earth work. cum Rs.4.00
    (Rupees four) only.
   
       
       
  ii) When laying of earth in layers is done from stockpiles including breaking of clods and dressing. cum Rs.16.90
    (Rupees sixteen and paise ninety) only.
   
       
       
(b) By mechanical means.    
  i) From earth in stock piles. cum Rs.19.20
      (Rupees nineteen and paise twenty) only.
     
       
22 Watering the earth to bring the earth to required O.M.C. cum Rs.16.30
  (Rupees sixteen and paise thirty) only.
     
       
23 Rolling to specification with the use of vibratory roller when earth is at suitable moisture contents -    
   
   
       
(a) With desired field density not less than 97% of maximum dry density (modified heavy proctor test). cum Rs.15.80
    (Rupees fifteen and paise eighty) only.
   
       
       
(b) With desired field density not less than 100% of maximum dry density (modified heavy proctor test). cum Rs.18.10
    (Rupees eighteen and paise ten) only.
   
       
       
24 Rolling to specification with power roller when earth is at suitable moisture contents -    
   
   
       
(a) With desired field density not less than 97% of maximum dry density (ordinary proctor test). cum Rs.8.20
    (Rupees eight and paise twenty) only.
   
       
       
(b) With desired field density not less than 100% of maximum dry density (ordinary proctor test). cum Rs.9.40
    (Rupees nine and paise forty) only.
   
       
       
25 Compaction of original ground with maximum of six passes of  8 - 10 tonnes Power Roller including filling in depression occuring during rolling. sqm Rs.2.80
  (Rupees two and paise eighty) only.
 
   