1 - EARTHWORK
Sl No Description Unit Rate
       
Notes :      
1 For items of Site Clearance & Earthwork not included in Part D,
  please refer  to respective chapters under Part B.
       
127 Earthwork in excavation to get the desired levels and areas and dressing of the surface by manual means including disposal of excavated earth by using it for filling and dressing wherever required within a  lead of 15m and lift upto 1.5m.    
   
   
   
   
   
       
(a) Ordinary soil cum Rs.72.40
      (Rupees seventy two and paise forty) only.
     
       
(b) Hard soil ( pick work ). cum Rs.94.50
      (Rupees ninety four and paise fifty) only.
     
       
(c) Soft Rock ( blasting work ). cum Rs.237.30
      (Rupees two hundred thirty seven and paise thirty) only.
     
       
(d) Hard Rock ( blasting work ). cum Rs.330.30
      (Rupees three hundred thirty and paise thirty) only.
     
       
(e) Chiselling/  wedging out rock where blasting is prohibited.    
     
       
  (i)  Soft Rock. cum Rs.417.90
      (Rupees four hundred seventeen and paise ninety) only.
     
       
  (ii)  Hard Rock. cum Rs.625.80
      (Rupees six hundred twenty five and paise eighty) only.
     
       
128 Earthwork in excavation in foundation trenches etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and subsequent filling as in column foundations, fence posts, etc. and disposal of all surplus soil as directed within a lead of 30 metres.    
   
   
   
   
   
   
       
(a) Oridinary Soil. cum Rs.85.00
      (Rupees eighty five) only.
     
       
       
       
(b) Hard Soil  ( pick work ). cum Rs.127.50
      (Rupees one hundred twenty seven and paise fifty) only.
     
       
(c) Very Hard Soil  ( jumper work ). cum Rs.198.30
      (Rupees one hundred ninety eight and paise thirty) only.
     
       
(d) Soft Rock ( blasting work ). cum Rs.279.00
      (Rupees two hundred seventy nine) only.
     
       
(e) Hard Rock ( blasting work ). cum Rs.388.20
      (Rupees three hundred eighty eight and paise twenty) only.
     
       
(f) Chiselling/  wedging out rock where blasting is prohibited.    
     
       
  (i) Soft Rock. cum Rs.596.30
      (Rupees five hundred ninety six and paise thirty) only.
     
       
  (ii) Hard Rock cum Rs.944.60
      (Rupees nine hundred forty four and paise sixty) only.
     
       
129 Filling available excavated earth (excluding rock) in trenches, plinth, etc. in layers not  exceeding 20 cms in depth,  consolidating each layer by ramming and watering and dressing lead upto 50 meters and lift upto 1.50 meters. cum Rs.32.00
  (Rupees thirty two) only.
 
   
   
   
       
       
130 Providing and filling stone aggregates of size below 90mm in plinth, etc. in layers not  exceeding 20 cms in depth,  consolidating each layer by ramming and watering and dressing complete. cum Rs.994.90
  (Rupees nine hundred ninety four and paise ninety) only.
 
   
   
       
       
131 Providing and filling approved river sand in trenches, plinth, etc. in layers not  exceeding 20 cms in depth,  consolidating each layer by ramming and watering and dressing complete. cum Rs.958.50
  (Rupees nine hundred fifty eight and paise fifty) only.
 
   
   